Skip to main content

Capital Project 2024-2026

The Capital Improvement Project final preparation is well underway (bids in February groundbreaking items other than playground will be this summer) with several exciting improvements benefiting our student programs, safety and security measures and facilities updates/replacements. 

Student Programs

One of the major projects is the renovation of the indoor pool, which includes upgrades to the HVAC system, improvements to mechanical and drainage systems, enhanced lighting, and the installation of new pool equipment. 

A bright indoor swimming pool with swimmers and spectators, featuring a modern design, large windows, and an orange-accented ceiling.

 

 

 

 

 

 

Pool Rendering #1

An indoor swimming pool area featuring multiple swimmers, bright lighting, and seating along the side. Large windows and clock visible.

 

 

 

 

 

 

Pool Rendering #2

In addition to the pool renovation, Phase 2 of the playground development is also moving forward. This phase aims to enhance the older elementary student’s play area with new equipment and interactive play-based features. 

Master plan for East Rochester Union Free School District, showing playground phases and layouts scheduled for summer 2024 and 2025.

 

 

 

 

 

 

2024-2025 Playground Development Renderings

A colorful playground design featuring climbing structures, slides, swings, and play areas, surrounded by green grass and trees.

2025-2026 Playground Development Renderings

 

ER’s Athletic Field will see the replacement of the stadium goal posts to ensure it meets current code compliance standards.

Close-up of a rusty green goalpost corner against a cloudy blue sky, highlighting wear and tear in the metal.Close-up of grass and soil around a rusted pole, speckled with bright yellow paint flakes and debris.

Don Quinn Field Stadium Posts

 

Safety and Security

A new PA system, phone system, and campus notification system will help standardize communication across the campus, ensuring that everyone remains informed and safe. A rescue window will also be added at the single point of entry to further enhance security and emergency preparedness. Additionally, East Rochester Union Free School District is working on various code compliances and accessibility upgrades to ensure that all of our facilities meet required accessibility standards.

An emergency display shows "Tornado - Take Cover," a digital clock, a phone, and a vent, with a school emblem in the corner.

 

 

 

 

 

 

 

Safety Technology Upgrades 

Facilities Updates/Replacements

ER Schools have various upcoming facility replacements planned. This includes a roof replacement and updates to the high school gym which will receive HVAC and lighting upgrades. The high school auditorium will see improvements to its HVAC system and stage finishes.

A view of a flat rooftop with a brick wall and some vegetation growing on the surface. A flat roof with visible signs of wear and tear, including discoloration and cracks.

 

Roof Replacement Photos

A spacious gymnasium featuring basketball and volleyball courts, with a player walking on polished wood flooring beneath bright lights.A close-up view of a wooden theater stage edge covered with black fabric, featuring worn spots and visible electrical outlets.

 Gymnasium Lighting Upgrade and Auditorium Stage Upgrades

If you have any questions, please contact:
Staci SanSoucie, Assistant Superintendent for Finance & Operations
East Rochester Union Free School District
(585) 248-6308

Capital Project Documents